Friday, June 29, 2012

A.Lamp Concrete Contractors has some miscellaneous items to complete in the coming weeks including completion of underground utility spot repairs, manhole repairs in the parkways, sidewalk removal and replacement, and repairing damaged mailboxes.

Due to the dry weather conditions, the contractor will not  be installing sod at this time.  The contractor will perform some grading of the disturbed landscape, but sod is not anticipated until the fall when the weather is more favorable for growing sod.

Please keep in mind the roadway will be resurfaced this summer as part of the 2012 Road Resurfacing Project.

Happy 4th of July.

Friday, June 22, 2012

A.Lamp Concrete Contractors has some miscellaneous items to complete in the coming weeks including completion of underground utility spot repairs, manhole repairs in the parkways, sidewalk removal and replacement, and repairing damaged mailboxes.

Due to the dry weather conditions, the contractor will not  be installing sod at this time.  The contractor will perform some grading of the disturbed landscape, but sod is not anticipated until the fall when the weather is more favorable for growing sod.

Please keep in mind the roadway will be resurfaced this summer as part of the 2012 Road Resurfacing Project.

Friday, June 15, 2012

Work remaining to be completed includes rough grading of disturbed areas, complete underground utility repairs, and sidewalk removal and replacement.

Due to the dry weather conditions, the contractor does not anticipate installing sod at this time.  The contractor will perform some grading of the disturbed landscape, but sod is not anticipated until the fall when the weather is more favorable for growing sod.

Please keep in mind the roadway will be resurfaced as part of the 2012 Road Resurfacing Project later in the year.

Friday, June 8, 2012


The contractor installed the temporary pavement patch along the north side of the roadway and street crossings.

Next week, the contractor will be on-site to perform a few underground utility repairs and landscape restoration.

Please keep in mind the roadway will be resurfaced as part of the 2012 Road Resurfacing Project later in the year.

Friday, June 1, 2012



The contractor completed concrete curb & gutter, driveways, and sidewalks on the south side of the roadway this week. Access to driveways is expected to be restored on Saturday, June 2nd. Thank you for your patience and cooperation.

The contractor anticipates asphalt patching the aggregate trenches along Joanne Drive. Driveway access to residents on the north side of the roadway will be limited during excavation and paving operations.  If you reside on the north side of Joanne, please have cars removed from your driveways by Monday, June 4th at 7:00 AM.  Access to your driveway will be restored later in the day Monday.  Driveways on the south side of the street will not be affected.